Changi Airport will suspend operations at Terminal 4 from May 16, following a suspension of services at Terminal 2 earlier. Airlines with operations in Terminal 4 will be relocated to either Terminals 1 or 3. This move will allow Changi Airport to consolidate all of its operations in these two terminals and cut expenditure and operating costs. Last month, Changi Airport handled 25,200 passenger movements and 3,870 aircraft movements. Airfreight throughput for the month stood at 96,500 tonnes.
Image: @aviationtravelofficial on Instagram
(Please do not repost or republish this post and image without permission)
Comments